• 南宫28ng

    REFERENCE HIGHLIGHTS

    BACK KR Pretreatment of Hot Metal for Rockcheck, China
    SHARE:


    Duration:2013 - 2014


    Scope:120t KR hot metal desulfurization station and auxiliary dedusting facilities


    Technical Data:final sulfur content ≤0.001%


    Highlights: main process and equipment are developed independently by Sinosteel MECC, reaching international advanced level


    Beijing ICP No.11020457 Technical support : zc-yd

    INVESTED COMPANIES

    • Sinosteel Engineering Design & Research Institute
    • Sinosteel Tiancheng Environmental Protection
    • Sinosteel Tendering Co., Ltd.

    LINKS

    • China Iron and Steel Association
    • Ministry of Commerce of P. R. China
    • China Securities Regulatory Commission